 Constraints in P6

استعرض الموضوع السابق استعرض الموضوع التالي اذهب الى الأسفل 
كاتب الموضوعرسالة
تامرالمصرى



عدد المساهمات : 239
تقييم : 0
تاريخ التسجيل : 30/03/2008
العمر : 40

مُساهمةموضوع: Constraints in P6   الثلاثاء يوليو 08, 2008 9:36 am

Here is the list of constraints and how they affect the schedule:

As late as possible: Changes early dates to the values calculated by backward pass (sets early dates to the late dates)

Finish on: Changes early finish and late finish dates to the date selected

Finish on or after: Changes early finish date to the date selected

Finish on or before: Changes late finish to the date selected

Mandatory finish: Changes early and late finish dates to the selected date, and it overrides any network logic related with this activity. If you set the mandatory finish date to a non-working date, then early finish will be set to the earliest working day, but late finish date will stay in the selected date in mandatory finish constraint; this will cause negative float in the activity.

Mandatory start: The same as mandatory finish but affects the start dates.

Start on: Sets the early and late start dates to the selected date

Start on or after: Sets the early start date to the selected date

Start on or before: Sets the late start date to the selected date
الرجوع الى أعلى الصفحة اذهب الى الأسفل
معاينة صفحة البيانات الشخصي للعضو http://engineers.yoo7.com
mercato_1



عدد المساهمات : 322
تقييم : 0
تاريخ التسجيل : 26/03/2008
العمر : 46

مُساهمةموضوع: رد: Constraints in P6   الثلاثاء يوليو 08, 2008 9:45 am

مشكور م/تامر
الرجوع الى أعلى الصفحة اذهب الى الأسفل
معاينة صفحة البيانات الشخصي للعضو http://www.bonyan.rab7net.org/vb/
 
Constraints in P6
استعرض الموضوع السابق استعرض الموضوع التالي الرجوع الى أعلى الصفحة 
صفحة 1 من اصل 1

صلاحيات هذا المنتدى:لاتستطيع الرد على المواضيع في هذا المنتدى
PM GROUP :: التدريب والتطوير-
انتقل الى: